Weco optoelectronic Co.,Ltd.
|
Payment Terms: | T/T,WU |
Place of Origin: | Zhejiang, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
4. Installation and connection
4.1. Installation: ARD has bolt hole on the bottom of the box, can be fixed firmly in structure with M8 bolt.
4.2. Connection
4.3. Voltage selection: Before use, please check the 4 place voltage selector state whether with the actual voltage consistent. The voltage selector position as follows:
4.4. Choosing stop pattern by the dial switch
Bit 1 = ON | ARD delay 4 s stop when received the door‐lock off signal. The door‐lock | ||
1 | off signal is from NC contact of door‐lock relay. In case of the door‐lock off | ||
Bit 2 = OFF | |||
signal not be used, ARD stop after continuous working 5 min. | |||
Bit 1 | = ON | ARD delay 4 s stop when received the door‐lock off signal. The door‐lock | |
2 | off signal is from NO contact of door‐lock relay. In case of the door‐lock off | ||
Bit 2 | = ON | ||
signal not be used, ARD stop after continuous working 5 min. | |||
3 | Bit 1 | = OFF | ARD work continuously until the battery energy is exhausted. |
Bit 2 | = OFF or ON | ||
4.5. Setting start time by potentiometer VR1
Minimum time: About 5 s (counter clockwise). Maximum time: About 25 s (clockwise)